A milestone inspection summary is one of the few documents that speaks directly to a condo building's structure. Here is how the law works in Boca Raton and how to read the report before your 7-day window closes.

·7 min read

Short answer

Florida requires a milestone structural inspection for condo buildings three or more habitable stories tall, first by December 31 of the year the building turns 30 (or 25 where the local agency requires it), then every 10 years. Boca Raton's own recertification ordinance uses the 25-year trigger for condo buildings within 3 miles of the coast. As a resale buyer you receive the inspector's summary, and the key questions are whether phase one found substantial structural deterioration, what repairs were recommended and how the association is paying for them.

A milestone inspection report tells you what a licensed engineer or architect found when looking at a condo building's structure, and for a Boca Raton condo buyer it is the closest thing to a structural report card you will get. Florida requires it for condo buildings with three or more habitable stories, first by the end of the year the building turns 30, or 25 where the local building official requires it, and every 10 years after that. Read it for three things: whether phase one found substantial structural deterioration, which repairs were recommended and how urgent they are, and how the association plans to pay for them.

The report will not tell you whether a unit is a good buy. It will tell you whether the building's structure is likely to compete with your mortgage for your money over the next few years.

Two rulebooks apply in Boca Raton

The state law is section 553.899 of the Florida Statutes, passed in 2022 after the Surfside collapse and amended several times since. Boca Raton had already acted: in August 2021 the city adopted its Building Recertification Inspection Program (Ordinance 5589, Section 19-162 of the city code). The two overlap but are not worded identically.

QuestionState milestone law (s. 553.899)City of Boca Raton recertification
Which buildingsThree or more habitable stories, wholly or partly condo or co-opCondo or co-op buildings of 3 or more stories or 50 feet or taller, counting uninhabitable stories such as underground parking; also threshold buildings
Age trigger30 years from the certificate of occupancy; the local agency may set 25 years based on conditions such as proximity to salt water30 years; 25 years for condo and co-op properties within 3 miles of the coastline
Repeat cycleEvery 10 yearsSet by the city's published recertification schedules (2027 to 2031 schedule posted)
What is filedSealed report plus a separate summary of material findingsStructural and electrical safety report checklists, with a $500 city review fee per application

Because the city counts parking levels and applies the 25-year coastal trigger, a building within 3 miles of the coast can come due earlier than the state's 30-year baseline suggests. If a listing's building is near its 25th or 30th certificate-of-occupancy anniversary, ask the association which cycle it is on and whether the city's Recertification Coordinator has accepted its last filing. The city page lists that contact.

Phase one and phase two, in plain terms

Phase one is a visual examination of habitable and nonhabitable areas, including the major structural components, with a qualitative assessment of their condition. The statute gives the engineer 180 days from the association's receipt of the city's written notice to submit it.

Phase two happens only if phase one finds substantial structural deterioration, which the law defines as distress or weakness that negatively affects the building's general structural condition and integrity. Cracks, peeling finishes and similar surface conditions do not count unless the engineer concludes they signal that kind of deterioration. Phase two can involve destructive or nondestructive testing, and the inspector must file a progress report with a completion timeline within 180 days of the phase one report.

The practical difference for a buyer is large. A phase-one-only report usually means routine or preventive work. A phase two means the engineer saw something serious enough to test, and the city must then require repairs to begin within 365 days of receiving the phase two report.

How to read the report: a reading order

The statute tells the inspector what the report must contain. Read those items in this order:

  1. The seal, date and scope. The report must carry the engineer's or architect's seal and signature and state the manner and type of inspection. Note the date: a report from several years ago may describe a building that has since had repairs, or deterioration.
  2. The deterioration finding. Look for an explicit statement on whether substantial structural deterioration was found, to a reasonable professional probability, and its extent. This single line decides whether phase two applies.
  3. Unsafe or dangerous conditions. The report must say whether any were observed, as the Florida Building Code defines them. Any "yes" here is the most serious finding the report can contain.
  4. Recommended repairs. Repairs for substantial deterioration and separate recommendations for remedial or preventive work on damaged items that do not rise to that level. Typical locations in coastal concrete buildings are balconies, slab edges, columns, garage decks and railings.
  5. Items needing further inspection. These are open questions. Until they are answered, nobody can price the full repair.

The law does not use color codes or letter grades, so do not expect a pass or fail stamp. You are reading an engineer's judgment, written for a building official.

What different findings tend to mean for your budget

What the summary showsWhat to ask nextPossible cost effect for you
No substantial deterioration, minor preventive itemsAre the items in the current budget or reserves?Usually absorbed by regular dues or reserves
No substantial deterioration, long list of remedial repairsHas the board bid the work? Is there a special assessment on an agenda?Possible special assessment or dues increase
Phase two requiredHas phase two been completed? What did testing show? Has the city set a repair deadline?Assessment likely; financing may be harder until repairs are documented
Unsafe or dangerous conditions observedWas any part of the building restricted? Are repairs under permit?Significant; lenders may treat the building as ineligible
Further inspection recommendedWho is doing it and when?Unknown until done; plan a cushion

The lending side matters as much as the engineering side. Fannie Mae's project eligibility rules treat a building that needs critical repairs as ineligible until the work is completed and an engineer's report or equivalent confirms the problem is resolved. If a structural inspection was completed within three years of the lender's review, the lender must review it, and a failed mandatory structural or habitability inspection is a listed warning sign. Our guide to financing a Boca Raton condo and project approval explains the rest of that review.

How the report reaches you as a resale buyer

Under section 718.503, a selling owner must give you, at the seller's expense, the inspector-prepared summary of the milestone inspection report if one applies, along with the association's most recent structural integrity reserve study (or a statement that none has been completed), the budget, the financial statement and other governing documents. You can cancel by written notice within 7 days, excluding weekends and legal holidays, after signing and receiving the required documents. That right ends at closing and cannot be waived.

The contract itself must also say whether the association has completed a milestone inspection, is not required to have one, or is required but has not completed it. The Florida Realtors condominium rider handles this with check boxes the association's status fills in. Read which box is checked before you sign; it tells you whether you are about to receive a report or a promise of one.

Associations also have their own notice duties. Within 45 days of receiving the report, they must send the summary to every owner, post it on the property and, if they must maintain a website, publish the full report there.

Read it together with the reserve study

The milestone report describes condition today; the structural integrity reserve study, required under section 718.112 for buildings three habitable stories or higher, estimates what the roof, structure, waterproofing, windows and other key components will cost over time. The two are linked: a recent milestone inspection can stand in for the visual part of the study, and the statute lets owners vote to pause or reduce reserve contributions for up to two budget years after a milestone inspection to fund recommended repairs. If you see a paused reserve contribution in the budget, the milestone report usually explains why.

When repairs are large, the money usually comes from a special assessment, a loan to the association or both. If an assessment is already approved or being discussed, read our guide to estoppel certificates in a Boca Raton closing, which shows how amounts owed on the unit appear before closing.

Questions to send before the 7-day window closes

  • What year did the building's certificate of occupancy issue, and is the association on the state cycle, the city's 25-year coastal cycle or both?
  • Has the city accepted the most recent recertification filing? Are any items open?
  • Was phase two required? If so, is it complete, and what repair deadline applies?
  • Which recommended repairs are done, under permit or not started?
  • Has the board discussed or approved a special assessment, a loan or a reserve pause to pay for them?
  • Have recent buyers in the building closed with conventional financing?

Engineering terms can be hard to judge on your own, and nothing here is legal or engineering advice. A Florida real estate attorney can review the documents within your cancellation period, and a structural engineer can explain a finding you are unsure about.

Once you know what the building may ask of owners, test the monthly number with room for it: run the unit through the Homvidia affordability calculator with a higher dues figure, or set your price range in a home profile so a local Realtor emails Boca Raton condo listings that fit the budget you can actually carry.

Questions buyers ask

Does every Boca Raton condo building need a milestone inspection?

No. The state law covers buildings with three or more habitable stories that are wholly or partly under condo or cooperative ownership, and it exempts buildings of one to four dwelling units with three or fewer habitable stories. Many low-rise garden-style condo buildings with one or two stories are outside it, though the association may still commission engineering reviews on its own.

The summary says no substantial structural deterioration was found. Am I done?

Not quite. Even a clean phase one can recommend preventive or remedial repairs for items that are not substantial deterioration, such as sealant, railings or spalling at a few locations. Ask whether those repairs are budgeted, scheduled or completed, and read the structural integrity reserve study for the bigger long-term costs.

What if the building is due for its inspection but has not finished it?

The resale contract must say so. You can still buy, but you are buying without the information the inspection will produce. Ask when the engineer was hired and whether the board has discussed likely repairs or assessments in its minutes.

Can I get the full report rather than the summary?

The seller must give you the inspector-prepared summary. Associations required to keep a website must post the full report and summary there, and as a prospective buyer you can ask the seller to request the full report from the association's official records.

Sources

  1. Florida Statutes — 553.899 Mandatory structural inspections for condominium and cooperative buildings
  2. City of Boca Raton — Building Recertification Inspection Program
  3. Florida Statutes — 718.503 Disclosure prior to sale
  4. Florida Statutes — 718.112 Bylaws, reserves and SIRS
  5. Fannie Mae Selling Guide — B4-2.1-03, Ineligible projects
  6. Florida Realtors — Condominium Rider CR-7 (redlined revision)
  • boca raton
  • condo
  • milestone inspection
  • building recertification
  • section 553.899
  • structural integrity reserve study
  • condo resale disclosure