The Condo Questionnaire: What Your Deerfield Beach Lender Asks the Association
Before your loan closes, the lender sends the association a questionnaire about delinquencies, ownership, insurance, repairs and lawsuits. Here is what each section asks and which answers cause trouble.
Short answer
The condo questionnaire is a form, usually Fannie Mae Form 1076 or Freddie Mac Form 476, that your lender sends to the association to confirm the building meets loan standards. It asks about completion, ownership concentration, delinquent dues, commercial space, insurance, litigation and structural issues. In Deerfield Beach, delays usually come from slow responses, unanswered safety questions or answers that reveal delinquencies, large repairs or lawsuits.
When you finance a Deerfield Beach condo, your lender does not take the building on faith. It sends the association a condo project questionnaire, usually the standardized Fannie Mae Form 1076 or its Freddie Mac twin, Form 476, and uses the answers to decide whether the building qualifies for your loan. The form asks about everything from delinquent dues to lawsuits to structural repairs. Knowing what is on it, and which answers stall a closing, lets you ask the right questions before your inspection period ends.
Why the form exists
Fannie Mae and Freddie Mac standardized the questionnaires in 2016, with a full form for full project reviews and a short form (1077 / 477) for limited reviews. Lenders are not required to use these exact forms, and many send their own versions, but the questions track the same eligibility rules.
The short form matters less now. Under Fannie Mae Lender Letter LL-2026-03, Limited Review is retired for applications dated on or after Aug. 3, 2026. Most established buildings now go through Full Review, or a Waiver of Project Review if they have two to ten attached units. Before that change, Florida buyers using Limited Review faced lower loan-to-value caps; Full Review typically means a fuller questionnaire instead.
Section by section: what the association is asked
The full form, revised December 2021, is organized like this:
Basic project information
Legal name, address, management contact, and a series of yes-or-no questions on features that can make a project ineligible: hotel-style rental pooling, deed or resale restrictions, mandatory paid memberships, non-incidental business income, and senior or care services. Deerfield Beach has 55+ communities and older beachside buildings where some of these answers need explanation, not alarm.
Project completion
Whether all phases and amenities are complete and whether the developer has turned over control. Most resale buildings in Deerfield Beach answer this quickly.
Newly converted or rehabilitated projects
Whether the project was converted from non-residential use in the past three years and, if so, whether an engineer found the structure sound and critical repairs complete.
Ownership and other information
This is where most problems surface. The association reports how many owners are 60 or more days behind on assessments, whether there is pending litigation, the count of owner-occupied, second-home and investor units, any person or entity owning multiple units, and any commercial space.
Insurance and financial controls
Carrier details for hazard, liability, fidelity and flood coverage, whether the building is in a flood zone and how much flood coverage it carries, and whether reserve accounts are separate and require two signatures.
The addendum on safety and assessments
Fannie Mae's project standards FAQs describe an optional addendum, in use since December 15, 2021, that captures deferred maintenance and special assessment details. According to the Community Associations Institute's June 2026 guide, it asks whether the association knows of any deficiency affecting safety, soundness, structural integrity or habitability, and whether future violations are expected from required inspections. For Deerfield Beach buildings three or more stories tall, those inspections include Florida's milestone inspection at 30 years, or 25 if the local agency requires it near salt water.
How the lender scores the answers
| Answer on the form | Test the lender applies | Source rule |
|---|---|---|
| Units 60+ days delinquent | No more than 15% of units, measured separately for regular and special assessments | Full Review, B4-2.2-02 |
| Multiple units owned by one person or entity | More than 20% of units in a 21+ unit building, or more than 2 in an 11 to 20 unit building, is ineligible | B4-2.1-03 |
| Commercial space | Above 35% is ineligible | B4-2.1-03 |
| Litigation | Ineligible unless minor, such as damages and costs within 10% of funded reserves | B4-2.1-03 |
| Critical repairs or failed inspections | Ineligible until repaired, including unfunded work over $10,000 per unit due within 12 months, or an evacuation order | B4-2.1-03 |
| Reserves in the budget | At least 10% of assessment income, rising to 15% for Full Review applications from Jan. 4, 2027 | B4-2.2-02; LL-2026-03 |
| Investor-owned share | The 50% limit was retired in 2026 for established projects under Full Review on investor loans | LL-2026-03 |
Two of these deserve their own reading. Our article on how owner delinquencies can block a Deerfield Beach condo loan shows why small buildings cross the 15% line fast, and the guide to condo litigation and your mortgage explains which cases lenders treat as minor.
The "unknown" problem
Boards and managers are not always willing to answer safety questions. CAI's guide reports that in a 2025 survey, 71% of respondents cited liability exposure from answering questions beyond their expertise, and lenders often push back on "unknown" answers. If you hear that the questionnaire came back incomplete, ask whether the association will provide the underlying documents instead: board minutes, inspection or engineering reports, the reserve study and the current budget. A lender may be able to answer its own questions from those records.
Fees, timing and who orders it
The lender orders the questionnaire, usually after you apply and the contract is signed. The association or management company sets its fee and turnaround, and many charge separately for rush service. The questionnaire is a different document from the estoppel certificate the closing agent orders, which has its own statutory rules on fees and delivery. Ask your lender three things on day one:
- Has it closed loans in this building recently, and was the project approved?
- Will it use Form 1076 with the addendum, or its own form?
- How many days does it expect, and does the loan commitment date in your contract leave room for that?
Red flags you can spot before the lender does
- A special assessment for structural or life-safety work that has been approved but not yet collected.
- Board minutes that mention an engineer's report and repairs still being "scheduled."
- One investor or entity buying units steadily over the past few years.
- A building with a ground-floor restaurant, store or marina office that may push commercial space higher.
- A master policy with a per-unit deductible above $50,000, which Fannie Mae no longer accepts for applications from July 1, 2026.
If you are buying the unit as a rental, our guide to financing a Deerfield Beach condo as an investor covers how these building tests combine with stricter investor rules.
If the building does not pass
A failed or incomplete review does not always end the purchase, but it changes your options quickly, so know them before the financing deadline in your contract:
- Ask what failed. A missing document can sometimes be cured; a delinquency rate or an active evacuation order cannot be fixed by the closing date.
- Try a different review path. A lender may be able to use a Waiver of Project Review for a building of two to ten attached units.
- Look outside Fannie Mae and Freddie Mac. Some portfolio and non-QM lenders finance buildings that fail a conventional review, usually with a larger down payment and different pricing.
- Use your contingency. If the contract's financing contingency is still open, talk to your agent or attorney about the deadline before it passes.
A building that fails today may pass once repairs are complete or delinquencies are collected, which is worth remembering if you still like the unit. Ask the manager what is being fixed and when.
Plan around the review
A building that passes review still has to fit your budget, and the same facts that worry lenders, such as low reserves or pending assessments, often end up in your dues. Price the unit by its full monthly cost in the affordability calculator, and use the mortgage estimate to see how a special assessment payment would change your debt-to-income picture before you commit.
Questions buyers ask
Who pays for the condo questionnaire on a Deerfield Beach purchase?
It depends on the contract and the lender. The association or its management company usually charges a fee to complete it, and the lender often passes that cost to the buyer. Ask for the fee and turnaround in writing early.
Is the questionnaire the same as the estoppel certificate?
No. The estoppel certificate states what the seller owes the association and is used by the closing agent. The questionnaire describes the whole building for the lender's project review.
Can the seller answer the questionnaire if the association won't?
Fannie Mae has signaled openness to the seller as a source of some information, but lenders usually want association records. If the manager refuses to answer some questions, ask whether it will provide the underlying documents, such as the budget, insurance declarations and inspection reports.
Does a cash buyer need a questionnaire?
No lender means no lender review, so no questionnaire. The same facts still matter for resale, because your future buyer's lender will ask.
Sources
- Freddie Mac — Condominium Project Questionnaire, Full Form 476 / Fannie Mae Form 1076 (December 2021)
- Fannie Mae and Freddie Mac — Standardized condo project questionnaires announcement (2016)
- Fannie Mae — Project Standards Requirements FAQs (March 2026)
- Fannie Mae — Lender Letter LL-2026-03, project standards and property insurance updates (March 18, 2026; copy hosted by Tenaco)
- Fannie Mae Selling Guide — B4-2.1-03, Ineligible projects (2026)
- Fannie Mae Selling Guide — B4-2.2-02, Full review process (2026)
- Community Associations Institute — Guide and FAQ for navigating Fannie Mae and Freddie Mac requirements (June 2026)
- Florida Statutes — 553.899 Mandatory structural inspections for condominium and cooperative buildings (2026)