The Final Survey and Elevation Certificate on a New Parkland Home

Before you close on a new Parkland house, two documents tell you where the house actually sits and how high its floor is. Read them against the site plan, not after the walk-through.

·6 min read

Short answer

The final survey shows where the finished house, driveway, pool and other improvements sit on the lot relative to the lines, setbacks and easements, and the elevation certificate records how high the lowest floor is compared with the flood elevation. On a new Parkland home, ask for both before closing, compare them with the approved site plan and the plat, and make sure the survey is certified to you, your lender and the title insurer.

Before you close on a new Parkland house, get two documents from the builder and read them against the approved plans: the final survey, which shows where the house, driveway, pool and other improvements actually ended up on the lot, and the elevation certificate, which records how high the lowest floor sits relative to the flood elevation. Neither one is glamorous, but together they confirm that what was built matches what you bought, they shape your title insurance and flood insurance, and they become the starting point for every fence, pool or addition permit you pull later.

The surveys behind a new house

Florida's surveying standards, in Rule 5J-17.050, list several survey types, including construction layout surveys, elevation surveys and as-built or record surveys. On a production home they usually happen in this order:

  1. Boundary and layout. A surveyor locates the lot lines and stakes where the house will go, following the approved site plan.
  2. Foundation check. Before the slab is poured, a surveyor confirms the footprint's position and the planned floor elevation from the forms. In the trade this is often called a form board survey; a later check of the placed slab is sometimes called a spot or tie-in survey.
  3. Final survey. After completion, the surveyor maps the finished improvements: house, driveway, walks, pool and deck, screen enclosure, fences, equipment pads and the easements that affect them.

The builder orders these for its own permits and inspections. What you want is the last one, issued close to closing and certified to you, your lender and the title insurer.

What to check on the final survey

Lay the survey next to the site plan from your contract and the recorded plat. Parkland lots in planned communities often back onto stormwater lakes, berms or preserves, so the rear of the lot is where most surprises sit.

ItemWhat to look forWhy it matters
Setback distancesFront, side and rear distances from the house to the linesThey should match the approved plan and leave the yard you expected
Lake maintenance and drainage easementsWidth and location along the rear or side linePools, fences and plantings in easements may be restricted or removable
Utility easementsStrips along the front or sideEquipment pads and generators placed here can conflict with access rights
Pool, deck and screen enclosureDistances to rear and side linesParkland sets separate setbacks for the pool and its deck or enclosure
EncroachmentsAnything crossing a line, including a neighbor's fence or sidewalkTitle insurers list survey matters as exceptions
Flood zone note and elevationsThe zone shown and any finished floor elevationShould agree with the elevation certificate

If you plan to add a pool later, our guide to lot size, setbacks and pool space in Parkland shows how to read the rear-yard numbers with the city's table.

The elevation certificate, from a buyer's side

An elevation certificate is FEMA's standard record of a building's elevations. FEMA describes it as part of a community's permit file showing that new buildings in special flood hazard areas are properly elevated, and the current form, FF-206-FY-22-152, is also used to rate flood insurance and to support a request to change a flood zone determination.

How Parkland's floodplain rules use it

Parkland's floodplain ordinance, Chapter 110 of the city code, names the building official as floodplain administrator. For the buildings it covers, it calls for lowest-floor elevation documentation once the lowest floor is placed and again at final inspection. Two provisions are worth knowing as a buyer:

  • Where no base flood elevation has been set, the ordinance uses a default of two feet above the highest adjacent grade unless there is evidence of greater flood depths.
  • It states that land outside mapped special flood hazard areas is not guaranteed to be free from flooding, and that areas whose surveyed ground elevations fall below the nearby base flood elevation are treated as flood hazard areas.

The city's flood plain information sheet points owners to a FEMA address search at cityofparkland.org/femasearch and refers to the Broward flood maps that took effect on August 18, 2014. Check FEMA's Map Service Center for the panel currently in effect, and call the Building Division with questions, as the city's flood information page suggests.

One certificate or several

Certificates can be prepared from construction drawings, during construction or after completion. One based on drawings or an unfinished building is not the final word. Ask for the certificate based on the finished house, and confirm the elevations on it match the final survey.

Disclosure and insurance

A builder selling a new house is a seller of residential property, so Florida's flood disclosure law, section 689.302, applies: at or before contract, the seller must state whether it knows of flooding that damaged the property during its ownership and whether it filed a flood claim or received federal flood assistance, and must remind you that homeowners policies do not cover flood. For a brand-new house those answers are often simple, but the form arrives early, before any elevation certificate exists. Keep it with your closing file and add the final certificate when you get it, because a flood insurance agent will ask for it whether or not your lender requires coverage.

Making the survey count at closing

Title insurance on a Florida owner's policy normally carries a standard exception for matters a survey would reveal. Underwriting guidance from WFG National Title explains that, under section 627.7842(1)(a), the exception can be deleted when a survey was completed within 90 days before closing, and that a new survey should be certified to the title insurer by a registered Florida surveyor. A survey that is older, uncertified or missing the final improvements may leave that exception in your policy. Our Delray Beach survey guide covers the resale side of the same rule.

Keep both documents for the life of the house

The survey and elevation certificate keep working after closing day.

  • Permits. A pool, fence, generator pad or addition application usually starts from a survey showing the current improvements. Having the final survey in digital form saves time and a surveyor's fee for small projects.
  • Flood insurance. An agent can use the certificate's elevations when quoting a policy, whether you buy one because your lender requires it or because you choose to.
  • Flood zone questions. If a future map revision changes the zone for your street, the certificate is the evidence you will need for any request to FEMA.
  • Selling. Title underwriters may accept a prior survey on a residential sale if the owner signs an affidavit that nothing has been built since. Keeping the original, and noting what you add, makes that possible.

Store them with your closing documents and the permit records for anything you change, so the next survey has a clean starting point.

When the as-built does not match the plan

Small differences are common and often harmless, such as a walkway a foot wider than drawn. Others deserve a written answer before closing:

  • The house or pool sits closer to a line than the approved plan shows.
  • Pool equipment, a generator pad or an air-conditioning unit is inside an easement.
  • A fence or landscape wall runs into a lake maintenance easement.
  • The finished floor elevation on the certificate is lower than the plan called for.

Ask the builder whether the city and the easement holder approved the condition, and request the approval in writing. If the contract allows a fix or a credit, a Florida real estate attorney can tell you how to raise it before the closing date passes. Some items may also fall under the builder's warranty, described in our article on new-home warranties in Parkland.

A new build's cost does not stop at the price and closing costs. Add flood insurance, if you choose or are required to carry it, to the monthly figure in the Parkland affordability calculator, and use a home profile to have a local Realtor email new-construction listings in the communities and price range you set.

Questions buyers ask

Does the builder have to give me the final survey on a new Parkland house?

The contract decides, so check it. Builders order surveys during construction for their own permits and inspections, and many provide the final one at closing. Ask that it be certified to you, your lender and your title insurer, and get a digital copy for later permit work.

My new Parkland house is not in a FEMA flood zone. Do I still need an elevation certificate?

Your lender may not require one, but it is still useful. An elevation certificate can support a flood insurance rate or a request to change a flood zone determination, and Parkland's ordinance says land outside a mapped flood zone is not guaranteed to be free from flooding. Ask the builder whether one was prepared.

What if the final survey shows the pool equipment inside an easement?

Raise it before closing. Ask the builder to explain whether the easement holder allows it, whether the city approved the location and who bears the cost if it must be moved. A Florida real estate attorney can tell you whether the contract lets you require a fix or a credit.

Can I use the builder's survey for my title policy?

Usually yes if it is recent and properly certified. Florida's title statute lets the insurer delete the standard survey exception when a survey was completed within 90 days before closing, and underwriters generally want it certified to them.

Sources

  1. City of Parkland Code (via Zoneomics) — Chapter 110, Floodplain management (accessed 2026)
  2. City of Parkland — Flood plain management information (accessed 2026)
  3. City of Parkland — Community Rating System and flood information (accessed 2026)
  4. FEMA — Glossary: Elevation certificate (accessed 2026)
  5. FEMA — Underwriting forms, Elevation Certificate FF-206-FY-22-152 (accessed 2026)
  6. Florida Administrative Code — Rule 5J-17.050, Surveying definitions (via Cornell LII, 2018)
  7. WFG National Title — Florida surveys: prior surveys and reliance on prior policies (accessed 2026)
  8. Florida Statutes — 689.302 Flood disclosure (2026)
  • parkland
  • new construction
  • final survey
  • elevation certificate
  • flood zone
  • title insurance
  • easements
Share LinkedIn Facebook X WhatsApp

Keep reading

All Parkland guides

New guides, once a week

Prices, taxes and neighborhood notes for the South Florida coast — no spam.