The Wedge: How Parkland's Northwest Corner Went From Palm Beach County Farmland to New Communities
The Wedge along Loxahatchee Road is where most of Parkland's newest neighborhoods sit. Its history explains the district bond lines, utility setup and open questions a buyer should check.
Short answer
The Wedge is the triangle of land in northwest Parkland along Loxahatchee Road that was part of Palm Beach County until about 2009, when roughly 1,949 acres were moved into Broward. Parkland then annexed it in pieces, and communities such as MiraLago, Watercrest and Parkland Bay were built there with bond-financed infrastructure from the North Springs Improvement District. For a buyer, that history shows up as extra bond lines on the tax bill, NSID water and sewer, and school and road questions to verify by address.
In Parkland, "the Wedge" is the triangle of land in the city's northwest corner, along Loxahatchee Road between the older parts of Parkland and the Everglades. It belonged to Palm Beach County until about 2009, when roughly 1,949 acres were moved into Broward. Parkland then annexed it in pieces, and much of the city's newest housing, including MiraLago, Watercrest and Parkland Bay, was built there. That history is still visible in three places a buyer will meet: the tax bill, the utility provider and the list of things that may change around you.
How the Wedge ended up in Parkland
Parkland started small. The city's own history page says it covered about 420 acres when it was incorporated in 1963 and now spans more than 8,000, bounded on the north by Loxahatchee Road. Much of that growth came through annexation, and the Wedge was the last large piece.
The obstacle was geography. A 2014 SFBW Magazine feature described the area, also called the Golden Triangle, as cattle pasture and farmland cut off from Broward by the Hillsboro Canal, which runs along Loxahatchee Road. Because it was in Palm Beach County, its road access ran north into a county it was not connected to in practice. The fix was to move the county line. The statute that describes Broward County's boundaries lists a 2007 law (chapter 2007-222) in its history, and press accounts date the transfer of about 1,949 acres to 2009.
Annexation into Parkland came afterward and not all at once. By 2014, the sections holding MiraLago and Watercrest were already in the city, and the rest was expected to follow. As late as 2021, The Real Deal reported that Parkland had signed an agreement to annex a parcel of nearly five acres at the Everglades edge, most of which was to become a city park. The practical point: do not assume a Loxahatchee Road address is inside the city. The parcel's record on the Broward County Property Appraiser site shows the municipality.
What was planned, and what changed
The Wedge did not fill in according to one master plan. Approvals shifted as owners and markets changed, which is why nearby land can still be in play. A few examples from public reporting:
| Year reported | What happened | Why it matters to a buyer now |
|---|---|---|
| 2014 | The city had approved 538 age-restricted homes on 178 acres at the Parkland Royale site; other large tracts, including a 401-acre tract and a 715-acre farm holding, had no approved plan in that report | Large holdings changed hands and plans over the following years |
| 2014 | Road extensions were planned, including University Drive north to Loxahatchee Road and Hillsboro Boulevard east of University | Check today's road network and any remaining projects on the city and county websites; do not rely on old plans |
| 2021 | The city approved 205 detached homes on 76 acres for a second phase near Loxahatchee Road, lifting a deed restriction that had limited the site to residents 55 and older | An approval can be revised, so ask what is approved next door, not just what is built |
Parkland's comprehensive plan treats the area as unfinished business. A transportation policy calls for updating the plan's traffic data after the Wedge annexation, and a housing policy names the future annexation area, along with the State Road 7 corridor, as places to explore mixed-use and attainable housing. Neither policy approves anything by itself, but both tell you where future applications are most likely to land.
The tax bill: why Wedge homes carry bond lines
Building neighborhoods on farmland required roads, canals, lakes, pump stations and water and sewer lines. In the Wedge, much of that was financed by the North Springs Improvement District through bonds repaid by flat, per-unit assessments on the tax bill. The district's adopted FY2026 budgets show how each community is set up:
| Community (NSID area) | Units | FY2026 bond lines per unit | Final maturity |
|---|---|---|---|
| MiraLago (Area A) | 750 | $786 special assessment + $725 water management | 2034 and 2044 |
| Watercrest (Area B) | 589 | $769 special assessment + $727 water management | 2034 and 2044 |
| Parkland Bay | 552 | $1,063 special assessment + $786 water management | 2038 and 2048 |
These sit on top of NSID's district-wide charges, a smaller pump station line in some areas and the city's stormwater fee. Our guide to water control district assessments on a Parkland tax bill walks through each line. Two points matter for the Wedge in particular. First, the amounts are set each year and the special assessment series retire years before the water management series, so the bill on a given house will step down in stages. Second, these are flat charges, so the homestead exemption, including the larger non-school exemption that Amendment 3 brings in starting January 1, 2027, does not reduce them.
Utilities, parks and the Everglades edge
The city's utility list shows NSID providing water, sewer, drainage and canal maintenance for MiraLago, Parkland Bay and Watercrest. That means one district handles both your tap water and the lakes behind the house, and its water bill arrives separately from the tax-bill assessments. If you are comparing a Wedge home with one in eastern Parkland served by Coconut Creek or Parkland Utilities, compare the utility bill too.
Recreation is still being added. The city's multi-use trails map marks Wedge Preserve Park as under construction, with a May 2025 start. The western end of Loxahatchee Road borders the Arthur R. Marshall Loxahatchee National Wildlife Refuge, so homes near the edge face open marsh rather than more subdivisions. That brings wildlife and seasonal insects with it; our piece on living on the Everglades edge in Parkland covers what to expect.
Schools and traffic: verify, do not assume
When the Wedge was opening up, school capacity was an open question. The 2014 report noted that two school sites had been donated and that the city had agreed to contribute up to $2 million toward modular classrooms. Since then, the comprehensive plan has required that rezonings increasing density not place students in a critically overcrowded school. None of that tells you which school serves a particular street today. Assignments can change as enrollment shifts, so check the school locator and ask about pending boundary reviews; our guide to verifying school assignment by address lays out the steps.
Traffic works the same way. Commute times from the Wedge depend on which roads connect to University Drive, Lox Road and the Sawgrass Expressway now, and on any construction still underway. Drive the route at the hours you would use it.
A buyer's checklist for a Wedge address
- Confirm the jurisdiction. On the property appraiser record, check that the parcel is in the City of Parkland and note the use code and legal description.
- Read the full tax bill. List every NSID and city line, then ask NSID which bond series apply and when each one matures.
- Look at the land next door. Check the Future Land Use Map and the city's development review agendas for vacant or agricultural parcels nearby. Our article on buying near active construction in Parkland covers how to read those signals.
- Ask the HOA about phases. In newer communities, ask whether the developer still controls the board, what amenities are finished and whether any later phase is unbuilt.
- Verify schools and routes. Use the district's locator and drive the commute at rush hour.
Putting a Wedge home into your budget
Because Wedge communities combine HOA dues, NSID bond lines and newer-home insurance pricing, two houses at the same list price can differ by several hundred dollars a month. Start with the Parkland affordability calculator to see what price range your monthly budget supports, then add the bond lines from the actual tax bill. If the Wedge fits, a home profile lets a local Realtor email you matching MLS listings there and elsewhere in Parkland, and the Parkland city guide puts the area in context with the rest of the city.
Questions buyers ask
Is every home along Loxahatchee Road inside the City of Parkland?
Not necessarily. The Wedge was annexed in stages, and at least one small parcel near the Everglades edge was still unincorporated Broward land as recently as 2021. Check the parcel's municipality on the Broward County Property Appraiser record before assuming city services, codes and millage apply.
Why does a Wedge home's tax bill look higher than a similar house in eastern Parkland?
Mostly because of non-ad valorem bond lines. NSID financed roads, drainage and utilities for these communities with bonds repaid by flat per-unit assessments, so the bill carries lines that older neighborhoods do not. The homestead exemption, including the larger non-school exemption starting in 2027, does not reduce those flat charges.
Can a builder still add homes or commercial space next to an existing Wedge community?
Possibly. Parkland's comprehensive plan has flagged the annexation area for further study, and county and city land use changes have been proposed nearby over the years. Look at the Future Land Use Map for neighboring parcels and ask the city's Planning and Zoning Division about pending applications.
Sources
- City of Parkland — A brief history of Parkland (accessed 2026)
- SFBW Magazine — Final frontier: Parkland's Wedge (July 2014)
- Florida Statutes — 7.06 Broward County boundaries (2026)
- The Real Deal — Brian Tuttle wins approval for 205-home project in Parkland (November 2021)
- North Springs Improvement District — Resolution 2025-09, adopted FY2026 budgets (2025)
- City of Parkland — Water utilities by community (accessed 2026)
- City of Parkland — Comprehensive Plan, Volumes 1 and 2 (2016, as amended)
- City of Parkland — Multi-use trails map, Phase One greenway corridor (2025)