Buying a Boca Raton Condo While the Building Is Under Repair

Scaffolding on a Boca Raton condo tower is not automatically a red flag, but it changes your loan options, your monthly cost and your first year in the unit.

·6 min read

Short answer

You can buy a Boca Raton condo while the building is under repair, but treat the special assessment as a second monthly payment and confirm early whether a lender will finance the unit. Fannie Mae-backed loans are not available while critical repairs remain unaddressed, though routine work and repairs funded by a special assessment are treated differently. Get the inspection reports, the assessment terms and the work schedule before your 7-day review window closes.

Buying a Boca Raton condo in a building that is under repair can work, and the price may reflect the inconvenience. But it changes three things: what the unit really costs each month, whether a lender will finance it, and what your first year of ownership looks like. The short version is to treat the special assessment as a second payment, confirm loan eligibility before you spend money on inspections, and get the work schedule in writing. Here is how to do each.

Why older Boca Raton buildings end up in repair projects

Two sets of inspection rules apply. Florida's milestone inspection law covers condo and cooperative buildings three stories or more, with structural inspections as buildings age and a second phase when the first finds substantial deterioration (s. 553.899). Boca Raton also runs its own Building Recertification Inspection Program under Ordinance No. 5589, adopted in 2021. It reaches condo and cooperative buildings three stories or 50 feet or taller, and uses a 25-year building age threshold for condo and co-op properties within three miles of the coastline and 30 years elsewhere, with a published schedule running into 2027 through 2031 (City of Boca Raton).

When an inspection finds concrete spalling, failing balconies or waterproofing problems, the fix is often a multi-year project funded by a special assessment, an association loan or both. For how to read the inspection itself, see our guide to reading a Boca Raton milestone inspection report.

Step one: get the paper trail inside your review window

On a resale, the seller must give you the declaration, bylaws, rules, budget and financial statement, the milestone inspection summary if applicable, the most recent structural integrity reserve study or a statement that none exists, and the FAQ document. The contract must give you seven days, excluding weekends and holidays, to cancel after receiving them (s. 718.503(2)). For a building under repair, ask the seller or manager for more:

  • The engineer's repair scope and the signed construction contract, with its price and schedule.
  • The written special assessment notice. Florida requires it to state the specific purpose, and the money may be used only for that purpose (s. 718.116(10)).
  • The payment schedule for the unit: amount, installments remaining and any association loan behind it.
  • Board minutes from the past year, which show change orders, delays and disputes.
  • An estoppel certificate, which must itemize all assessments and special assessments owed on the unit.

Step two: confirm a lender will finance the unit

Fannie Mae's project rules are the reference point for most conventional condo loans. It treats a project as ineligible when it needs critical repairs, meaning work that significantly affects safety, soundness, structural integrity or habitability, or the project's financial viability. Its examples include material deficiencies likely to cause a critical system failure within a year, water intrusion, advanced deterioration, a failed mandatory inspection, and unfunded repairs costing more than $10,000 per unit that should be done within 12 months (Selling Guide B4-2.1-03).

The details matter for a building mid-project:

  • Routine and preventive work, and repairs funded through a special assessment, are not counted toward the $10,000-per-unit unfunded repair test.
  • If a structural or mechanical inspection from the last three years shows critical repairs that have not been addressed, the project is ineligible until they are completed and documented, typically with an engineer's report.
  • For every current or planned special assessment, the lender must learn its purpose, approval date, original and remaining amount, and expected payoff date. An assessment tied to an unfixed critical repair makes the project ineligible.
  • A building under an evacuation order for an unsafe condition is ineligible until it is deemed safe.

Questions for the lender's condo review team

  • Has your company already reviewed this building, and when?
  • Which documents do you need from the association: questionnaire, engineer's letters, budget, reserve study, minutes?
  • Will you treat the current project as critical repairs, routine work or an assessment-funded project?
  • If a phase finishes during my contract, what proof of completion will you accept?
  • How long does your review usually take, and does it fit my financing deadline?

Ask a lender to review the building before you order an inspection or an appraisal. If it does not qualify, the realistic paths are cash, a portfolio or non-QM lender, or waiting. Our guide to financing a Boca Raton condo explains project review in more depth.

Step three: budget the assessment as a second payment

A hypothetical shows why. Assume a $400,000 Boca Raton condo, 20% down, a 30-year loan at an illustrative 6.5% rate (current averages are in Freddie Mac's weekly survey), and our site's planning figures for tax, HO-6 insurance and dues.

Monthly lineNo assessmentWith a $1,000 monthly installment
Principal and interest$2,023$2,023
Property tax$433$433
HO-6 insurance$100$100
Dues$725$725
Special assessment installment$0$1,000
Total$3,281$4,281

Flip the question around. If $3,281 a month is your ceiling, the same assumptions with a $1,000 installment support a price of only about $237,000. That gap is the real cost of the repair project to you, and it is the number to bring to a price negotiation. Options include a lower price, a seller credit, or the seller paying the remaining balance at closing; the contract decides, and our article on special assessments announced before closing walks through how those terms usually read.

Two more lines to add. Dues often rise after a repair project as the association rebuilds reserves. And your HO-6 loss assessment coverage matters more in a building that is already stretched; see our guide to sizing loss assessment coverage.

Step four: price the timeline risk

Construction rarely finishes early. Concrete restoration can uncover more damage once surfaces are opened, and every change order costs money. Ask:

  1. Is the construction contract a fixed price or cost-plus, and how large is the contingency?
  2. How did earlier phases compare with budget and schedule?
  3. Is the association borrowing, and if so, how is the loan repaid and what happens if it runs short?
  4. Is there any litigation with contractors, engineers or insurers? Lenders treat some litigation as a problem for financing too.

Ask, too, whether the association has a plan if a contractor walks off the job or an insurer disputes a claim tied to the damage. Boards that have thought this through usually say so in their minutes, and their answers tell you how much cushion the project really has.

Remember that Florida makes a new owner jointly liable with the previous owner for unpaid assessments due before the transfer (s. 718.116(1)(a)). A clear contract split and a current estoppel certificate keep the seller's arrears from becoming yours.

Living in the building while work continues

The daily effects are worth asking about directly, because they decide whether you can live in or rent the unit comfortably:

  • Balcony access and when your balcony is scheduled to be closed or opened up.
  • Whether windows or shutters must be removed or kept closed during work.
  • Pool, garage and elevator closures, and parking changes for crews and equipment.
  • Permitted work hours, dust and noise controls, and who to call with a problem.
  • Whether the association limits move-ins or new leases while work is under way.

Run your own version

Put your assessment installment into the dues field of the affordability calculator with the condo setting, and you will see the price your budget actually supports. If you want a local Realtor to watch for units in buildings that have finished their repairs, fill out a home profile with the cities and price range you want.

Questions buyers ask

Can I get a mortgage on a Boca Raton condo with scaffolding on the building?

Possibly. Lenders look at what the repairs are and whether they are critical, completed or funded. A building with routine work or an assessment-funded project may pass, while one with unaddressed critical repairs or an evacuation order will not qualify for a Fannie Mae loan until the work is completed and documented.

If the assessment is payable over three years, do I take over the remaining installments?

Usually the buyer and seller decide that in the contract. Without a clear agreement, Florida law makes a new owner jointly liable with the seller for unpaid assessments due before the transfer. Make the split explicit and check the estoppel certificate before closing.

Should I wait until the repairs are finished to buy?

Waiting can open more loan options and remove cost-overrun risk, but the price may also reflect the finished work. Compare the price now plus the remaining assessment with the likely price later, and ask how confident the board is in the budget.

Can the board raise the assessment after I buy?

If the project costs more than planned, the association may need more money, through a new assessment, a loan or higher dues. Ask whether the contract has a fixed price, how large the contingency is and how earlier phases compared with their budgets.

Sources

  1. City of Boca Raton — Building Recertification Inspection Program (accessed 2026)
  2. Fannie Mae Selling Guide — B4-2.1-03, Ineligible projects (November 2026)
  3. Florida Statutes — s. 718.503, Disclosure prior to sale (2026)
  4. Florida Statutes — s. 718.116, Assessments; liability; estoppel certificates (2026)
  5. Florida Statutes — s. 553.899, Mandatory structural inspections for condominium and cooperative buildings (2026)
  6. Freddie Mac — Primary Mortgage Market Survey (accessed 2026)
  • boca raton
  • condo
  • special assessment
  • building repairs
  • condo financing
  • milestone inspection
  • affordability
Share LinkedIn Facebook X WhatsApp

New guides, once a week

Prices, taxes and neighborhood notes for the South Florida coast — no spam.