Construction-to-Permanent Loans for a Parkland Custom Build: Draws, Rate Locks and Contingency
A construction-to-permanent loan pays for the lot and the build in stages, then turns into a regular mortgage. Here is how draws, interest, rate locks and cost overruns work on a custom Parkland house.
Short answer
A construction-to-permanent loan funds the lot and the build in stages called draws, charges interest only on the money already paid out during construction, and then converts into a regular mortgage once the house is finished. With a single closing you qualify and pay closing costs once; with two closings you take a construction loan and later refinance into a separate mortgage. On a Parkland custom house, the key decisions are how the rate is set for the permanent phase, how much contingency to fund, and how the lender inspects and releases each draw.
A construction-to-permanent loan is how most buyers finance a custom house in Parkland when they are not paying cash: the lender funds the lot and the build in stages, you pay interest only on what has been paid out, and when the house is finished the loan converts into an ordinary mortgage. The structure solves two problems at once, paying a builder over many months and ending up with long-term financing, but it adds risks a resale purchase does not have. The rate for the permanent phase may not be set yet, the build can run long, and the lender will not cover cost overruns without new approval.
One closing or two
Lenders offer two broad structures. The difference affects how often you qualify, how many closing costs you pay and when your long-term rate is fixed.
| Single closing | Two closings | |
|---|---|---|
| How it works | One loan, one set of documents; it converts automatically when construction is complete | A short-term construction loan, then a separate mortgage that pays it off |
| Qualifying | Once, with a possible update before conversion | Twice, under the rules in force at each closing |
| Closing costs | One set | Two sets, including new title and lender charges |
| Permanent rate | Set at closing, or modified on or before conversion if the loan allows | Set at the second closing at the market rate then |
| Flexibility | Less; you stay with the same lender | More; you can shop the permanent loan |
Many Parkland custom builds produce loans above the 2026 one-unit conforming limit of $832,750 set by the FHFA, so the loan is often a bank's own jumbo construction product rather than one sold to Fannie Mae. Fannie Mae's single-closing rules are still a useful benchmark, because many lenders copy their structure.
What Fannie Mae's single-closing rules require
According to Selling Guide section B5-3.1-02 and the construction-to-permanent product matrix:
- No single construction period may exceed 12 months, and the total may not exceed 18 months.
- For a purchase, loan-to-value is measured against the lesser of the lot price plus construction cost, or the as-completed appraised value.
- Only the rate, loan amount, term and amortization type may be modified, on or before conversion; a loan-amount increase must cover documented higher construction costs.
- Credit documents must be no more than four months old at the note date, and income, employment and credit generally must be updated within four months before conversion unless the loan qualifies for an extended window.
- A completion report is required at the end. If it shows a decline in value, a new appraisal and requalification follow.
How draws work, with a hypothetical Parkland build
This example is illustrative only. It assumes a $450,000 lot plus a $1,100,000 construction contract, for a total cost of $1,550,000, with 20% down ($310,000) applied first, a $1,240,000 loan, a hypothetical construction-phase rate of 7.0% charged interest-only on the drawn balance, and a hypothetical 6.5% permanent rate. Actual draw stages and percentages are set by your contract and lender.
| Stage (month) | Draw | Balance drawn | Monthly interest at 7.0% |
|---|---|---|---|
| Closing: balance of lot price (months 1–2) | $140,000 | $140,000 | About $817 |
| Foundation and slab (months 3–4) | $165,000 | $305,000 | About $1,779 |
| Block, trusses and roof dry-in (months 5–6) | $275,000 | $580,000 | About $3,383 |
| Windows, mechanical, electrical, plumbing (months 7–8) | $275,000 | $855,000 | About $4,988 |
| Drywall, finishes (months 9–10) | $220,000 | $1,075,000 | About $6,271 |
| Final draw at completion | $165,000 | $1,240,000 | Converts to permanent loan |
Interest during the ten months adds up to roughly $34,500 in this example. After conversion, principal and interest on $1,240,000 at 6.5% over 30 years is about $7,838 a month, before taxes, insurance and any association dues. If you are still paying rent or a mortgage on your current home during the build, budget for both. Some lenders let you fund an interest reserve from the loan; others require you to pay interest monthly from your own cash.
What happens at each draw
- The builder submits a draw request for the completed stage.
- The lender's inspector confirms the work is in place. This is separate from the City of Parkland's code inspections.
- The title agent updates the title search and collects lien releases from the contractor and suppliers paid from the previous draw.
- The lender wires the funds, often minus a retainage held until completion.
Florida's lien rules and the city's permit process
Florida's construction lien law is designed so that subcontractors and suppliers can claim against the property if they are not paid, even if you paid the builder. Under section 713.13, a notice of commencement must be recorded and posted on the site before the first inspection. A lender must record it before releasing construction funds and designate itself to receive copies of notices to the owner. The statute's own warning says improper payments can mean paying twice for the same work.
In practice that makes lien releases with each draw, and a final contractor's affidavit before the last payment, non-negotiable. Your title agent and a Florida real estate attorney can tell you which documents your lender requires.
The City of Parkland handles building permits through its electronic permitting system, and county school and road impact fees are paid before the city issues the permit. Budget those up front, using our guide to impact fees and permit costs on a custom Parkland home, because the lender may require them to be paid from your funds before the first construction draw.
Locking the rate when you will not move in for a year
A rate lock holds a rate for a set period, and the longer the period the more it usually costs. For a custom build, you will see three approaches:
- Lock at closing for the whole term. You know the permanent payment from day one. Ask whether there is a float-down or modification option if rates fall before conversion.
- Float, then lock near completion. You keep the chance of a lower rate but carry the risk of a higher one. Test your budget at a rate at least one percentage point higher.
- Two-closing route. You shop the permanent loan near completion. You also requalify then, so a job change or new debt during the build can derail it.
Our article on long rate locks for a new build compares lock lengths and float-downs in more detail; the mechanics are similar for a custom build.
Contingency, change orders and overruns
The loan amount is based on the contract price. If tile, windows or a pool deck cost more than budgeted, the lender does not automatically lend more. Under Fannie Mae's rules an increase is possible only for documented construction cost increases and requires underwriting again, and a jumbo lender may be stricter. Plan for overruns with your own money:
- Hold a contingency in cash. In the example above, setting aside 5% of the construction contract would mean $55,000 on top of the down payment and closing costs. Your builder and lender may suggest a different figure.
- Write change orders down. Every change should state its price and its effect on the schedule, signed before the work begins.
- Know the delay terms. Hurricane season, inspection backlogs and material delays can stretch a schedule past the loan's construction period. Our guide to delayed new-build closings in Parkland covers how delay clauses and rate-lock extensions interact.
- Keep reserves after closing. Lenders may require months of payments in reserve at conversion, and an appraisal that comes in low at completion can require more cash.
Before you sign with a lender
- Is this a single-closing or two-closing loan, and what fees apply at each stage?
- How is the permanent rate set, and can it be modified before conversion?
- What is the maximum construction period, and what does an extension cost?
- How many draws, who inspects, and how long from request to funding?
- Is interest paid monthly from my cash or from an interest reserve?
- Which documents will be updated before conversion, and could I be requalified?
Start from the finished payment
The number that lasts is the payment after conversion, not the interest during the build. Run the finished price through the Homvidia affordability calculator with a rate a bit above today's to see the monthly cost of the house you are planning, and use the anonymous mortgage estimate to see how your income and debts support it before you meet a construction lender.
Questions buyers ask
Do I need to own the lot before applying for a construction-to-permanent loan in Parkland?
No. Under Fannie Mae's single-closing rules, the loan can be a purchase in which proceeds buy the lot and fund construction. If you already own the lot, the loan is treated as a limited cash-out refinance that pays off any lot lien and funds the build.
What happens if construction in Parkland takes longer than the loan allows?
Ask the lender before closing. Fannie Mae's single-closing rules limit any one construction period to 12 months and the total to 18 months, and portfolio lenders set their own limits. An extension can mean fees, updated documents and requalification.
Can my rate change between closing and move-in?
It depends on the structure. Some single-closing loans set the permanent rate at closing; others allow the rate to be modified on or before conversion. With two closings, the permanent rate is set at the second closing at the market rate then.
Who checks the work before each draw is released?
The lender typically sends an inspector or relies on a draw inspection to confirm the stage is complete, and the City of Parkland conducts the building code inspections. They are separate checks: a passed city inspection does not by itself release lender funds.
Sources
- Fannie Mae Selling Guide — B5-3.1-02, Conversion of construction-to-permanent financing: single-closing transactions
- Fannie Mae — Construction-to-permanent product matrix
- Florida Statutes — 713.13 Notice of commencement
- CFPB — What's a lock-in or a rate lock?
- City of Parkland — Electronic permitting (MGO)
- FHFA — Conforming loan limit values for 2026